Migration law guide

Seasonal Work Permit in Poland

Seasonal Work Permit in Poland

Current-law research date: 2026-09-23. This guide is task-specific: The first Polish seasonal work permit (zezwolenie na pracę sezonową): employer-side permit object, sector/activity eligibility, initial register/permit workflow and the worker’s linked entry/stay position.

Before applying: Seasonal Work Permit in Poland

Ask the Polish employer to classify the actual work before preparing a seasonal permit application.

Documents to check
Job duties, location and contract terms alongside the worker’s passport.
Common mistake
Treating the work permit as proof of the right to enter can leave the travel file incomplete.
Next step
Check the employer’s permit route and the worker’s entry and stay requirements separately.

What to do first

  • Confirm the activity is one of the designated seasonal activities before filing.
  • Employer files through the competent starosta/powiat labour office channel, exclusively electronically via praca.gov.pl.
  • Coordinate the work permit with the worker’s lawful entry/stay document.

When the Polish seasonal-work permit is the right object

The seasonal-work permit is a specific Polish work-authorisation object, not a synonym for any short-term job. Current official guidance ties it to activities designated as seasonal under the applicable regulation. The seasonal route can cover no more than nine months in a calendar year.

The employer is the party to the permit proceeding before the competent starosta. The permit legalises the specified work; it does not by itself replace the worker’s visa, visa-free entitlement or residence basis.

Initial-permit decision tree

  1. Is the job in a designated seasonal activity? If no, stop and identify the correct work-authorisation route.
  2. Is this the first seasonal authorisation for the intended period? If no and an existing permit must be continued, use the extension procedure.
  3. Is the worker abroad? If yes, the employer-side register/permit sequence must be coordinated with the worker’s later entry/visa step.
  4. Is the worker already in Poland? Confirm lawful stay separately; a work permit does not cure an unlawful-stay problem.
  5. Will the total seasonal work exceed nine months in the calendar year? If yes, the seasonal route cannot simply be stretched beyond the statutory ceiling.

What the employer must fix in the application

Application factWhy it matters
Employer and work locationCompetence and the actual employment object
Type of work/activitySeasonal-activity eligibility
Remuneration and working timePermit terms and labour-law consistency
Contract type and datesDefines the authorised employment period
Worker identityPermit is tied to the named foreign national

The 2026 Public Employment Service guidance states a PLN 100 fee for this application. Filing mechanics and required attachments should still be checked with the competent office at submission.

Permit, entry and stay are three different checks

A seasonal work permit answers whether the named foreigner may perform the specified seasonal work. A visa or visa-free entitlement answers whether the person may enter and remain for the relevant period. For longer in-country seasonal work, a temporary residence permit for seasonal work is a separate object with its own conditions. Always run all three checks against the same dates.

A current 2026 nationality-specific restriction also matters at the entry/stay layer: from 22 August 2026, citizens of Colombia, Georgia and Venezuela may not perform work in Poland on the basis of a work permit, including a seasonal permit, while their stay is based on visa-free travel. The transitional rule protects qualifying work already begun before 22 August 2026 only for the remaining visa-free stay. For a new case in this group, obtain the appropriate work-authorising visa rather than treating a seasonal permit plus visa-free entry as sufficient.

Common failure modes before filing

ProblemResult-changing factAction
Job called “seasonal” but activity is outside the designated listActual activity classificationUse the correct non-seasonal work route
Worker has prior seasonal periodsTotal months in the same calendar yearRecalculate the nine-month ceiling
Employer has an existing permit and wants more timeExisting authorisation and datesMove to extension analysis
Permit is granted but stay expires earlierVisa/residence expiryFix stay independently before work continues
Colombian, Georgian or Venezuelan worker plans to rely on visa-free stay after 22 August 2026Nationality + date work actually began + basis of stayDo not rely on visa-free stay for new permit-based work; test the transitional rule or obtain the appropriate work visa

Case-specific facts that still change the answer

The route cannot be finalized without the applicant-specific facts below. Do not infer them from nationality, job title or document labels alone.

  • What activity/PKD and job will actually be performed?
  • How many months of seasonal work has the worker already used in the calendar year?
  • Is the worker outside Poland or already lawfully present?
  • What remuneration, hours, contract type and work dates will be declared?
  • Is the worker a citizen of Colombia, Georgia or Venezuela, and if so is the intended stay visa-free or based on a work-authorising visa?
  • If the 22 August 2026 transitional rule is claimed, did permit-based work actually begin before that date?

Last reviewed: 2026-10-03

Author: Razmik Khachatrian

Migration & International Mobility Services · MIGRATION AGENCY by Lex Agency LLC · Author profile